Celotex Re-Roof Project
Sunbury, PA

Replaced over 30,000 s.f. of deteriorated concrete roof
with stainless steel roof panels.
Replaced approximately a third of the deteriorated main
structure with over 62 ton of new structural steel.
The plant remained in operation through out
the project. |
|
|
|
 |
Celotex - Truck Dumper
Sunbury, PA

The truck dumper
has a
63 degree maximum incline.
A full tractor trailer load of wood
chips can be dumped in minutes. |
|
|
|
 |
Knoebels Grove Amusement Park
Elysburg, PA

The specialized rigging, dismantling, relocating and
reassembling of machinery became one of Zartman’s
specialties in 1975.
Since then we have handled a wide range of
difficult machinery packaging and transporting
jobs, such as the relocation and rebuild of the Phoenix
roller coaster at Knoebels Grove. |
|
|
|
 |
Pennsylvania House Furniture
Lewisburg, PA

28’ Dia X 10’ high
metal roof section
with explosion panels. Designed,
fabricated and installed by Zartman
on an existing concrete silo. |
|
|
|
 |
Pennsylvania Power and Light
Sunbury Steam Electric Station

Settling Basin
18" Thick Slab
92' Wide
135' Long
5'6" High Walls
12" Thick |
| |
|
 |
Pennsylvania Power and Light
Sunbury Steam Electric Station

Sluice Trough
Outlet Channel
580' Long
9' Wide
135' Long
965 Yards of Concrete
63 Tons of rebar |
| |
|
 |
Schuylkill Energy Resources
Shenandoah, PA

Installing
Heavy Drum Cleaner
Zartman Construction has the capability and resources to
handle all processing machinery and systems installations,
mechanical or pneumatic, on a "turn key" basis. |